MONOLITH

Casting structure

RAW
CONCRETE.

Structures cast for decades — towers, campuses, and civil works delivered with rebar-level discipline.

FORCE FIRST.
FORM FOLLOWS.

Every MONOLITH project begins in the structural model — load paths calculated, tolerances locked, materials stress-tested before a single form is poured. We resolve forces. Decoration come later.

1987

Founded

3

Continents

0

Failures

DISCIPLINE
EXPLORER

Four crafts under one accountable entity. Select a discipline to inspect scope, method, and field metrics.

Structural steel and industrial systems
STR-01

STRUCTURAL

12,400 tonnes steel

Post-tensioned concrete, composite steel frames, and seismic isolation systems engineered past local code. Every connection modeled in BIM before fabrication.

    PROJECT
    COMPOSER

    Configure type, footprint, floors, and finish tier. Receive a directional estimate and projected timeline — subject to site survey and geotechnical confirmation.

    Directional estimate

    CHF 4.2M

    Commercial · 2,400 sqm · 6 floors · Premium

    Est. duration: 18 months

    Project type

    Finish tier

    2,400 sqm
    6 floors

    BUILD
    SEQUENCE

    Pinned timeline — six phases from site prep to handover. Zero gaps between trades.

    Construction phase visual
    16%

    Week 1–8

    SITE PREPARATION

    Demolition, grading, and utility relocation. Geotechnical borings confirm bearing capacity. Temporary works and safety perimeter established before excavation begins.

    MATERIALS
    ATELIER

    Every specification carries traceable origin, test certificates, and embodied carbon data. Select a family to review grades and applications.

    Reinforced Concrete

    C40/50 — POST-TENSIONED

    High-strength mix with low-permeability admixtures. Post-tensioning cables stressed to 75% UTS after 7-day cure. Typical for transfer slabs and long-span floors.

    Compressive

    50 MPa

    Embodied carbon

    285 kg CO₂e/m³

    SELECTED WORKS

    Aerial view of urban high-rise construction district

    Mixed-use · 42 storeys

    MERIDIAN TOWER

    Composite steel frame, unitized curtain wall, LEED Platinum. Delivered on a constrained urban plot.

    Custom residence at dusk

    STONEGATE

    Residence · 680 sqm

    Commercial office fit-out interior

    NEXUS CAMPUS

    Workplace · 12,000 sqm

    Commercial building exterior

    ATLAS HALL

    Commercial · Facade retrofit

    Urban skyline under construction

    HORIZON DISTRICT

    Masterplan · Civil + structural

    0

    Projects delivered

    0

    Square metres built

    0

    Tonnes of steel

    100%

    Code compliance

    Civil infrastructure works

    CIVIL

    Interior fit-out detail

    FIT-OUT

    Completed residential structure

    HANDOVER

    START YOUR
    BUILD

    Submit your brief. Feasibility assessment within five business days. Enterprise and government contracts receive a dedicated project director.

    01 Bahnhofstrasse 42, 8001 Zurich CH

    02 +41 44 215 8800

    03 projects@monolith.build